Projects

Opus Corporation
(December, 1979 – September, 1988)

RWA Project Timeline

<- Gingold-Pink Architecture, Inc. Setter, Leach & Lindstrom, Inc. Paul Katz & Associates Opus Corporation Opus Southwest Corporation RWA Contract Services ->
Select an era from above

Commercial Office

American Medical Systems, Inc. — 1981

A 72,000 square foot, 2-story office and laboratory building; negotiated Design Agreement and Construction Contract; performed complete design-build construction services; 2-45,000 square foot additions followed initial project.

Opus 2 Office Park; Minnetonka, Minnesota

Minnesota Mutual Fire & Casualty Insurance — 1981

A 37,500 square foot, 2-story office building; negotiated a Design Agreement and Construction Contract; performed complete design-build construction services.

Opus 2 Office Park; Minnetonka, Minnesota

Opus Center — 1980–1983

A 3-year project involving sales/contract negotiating and complete design-build services; 10-story office, 350,000 square feet of multi-tenant office space over 370,000 square foot, 1100 car garage structure on 20 acre heavily landscaped site.

Opus 2 Office Park; Minnetonka, Minnesota

Opus Center Leasehold Improvements — 1983–1985

Design and construction of over 35 tenant improvements, involving 350,000 square feet.

Opus 2 Office Park; Minnetonka, Minnesota

Wagner Spray Tech Remodeling — 1983

Provided complete facility planning study, with major office remodeling and expansion to this existing Opus-built corporate headquarters.

Plymouth, Minnesota

Opus Gateway Office Building — 1983–1984

An 80,000 square foot, 4-story multi-tenant office building; provided design-build services for a shell office building, followed by tenant build-out.

Opus 2 Office Park; Minnetonka, Minnesota

Hewlett-Packard Office Addition & Remodeling — 1983–1984

A 40,000 square foot, single story office addition and remodeling and a separate 5,000 square foot cafeteria/kitchen addition, all to existing Opus-built project.

Falcon Heights, Minnesota

National Car Rental Systems Addition & Remodeling — 1985–1986

A 110,000 square foot, 5-story office addition/remodeling to Opus-built corporate headquarters facility; work consisted of sales, contract negotiations & complete design-build services through project close-out.

Edina, Minnesota

Eagandale Office Center — 1986

A 75,000 square foot, 3-story multi-tenant, speculative office building for Northwestern Mutual Life Insurance Company, in Eagandale Business Park; full design-build services were provided for the master planning, individual building and tenant improvement build-out.

Eagan, Minnesota

Sperry Computer Systems Division Headquarters — 1986–1987

A 155,000 square feet, 6-story build-to-suit office structure, designed and built for NML in the Eagandale Business Park; project was 100% occupied by Sperry Corp; full design-build services included interior office planning and improvements.

Eagan, Minnesota

American Hardware Mutual Insurance — 1988

A 175,000 square foot build-to-suit, speculative office building for net lease tenant; full design-build services were provided for Opus Real Estate group and the tenant.

Opus 2 Office Park; Minnetonka, Minnesota

JCAHPO — 1988

A 10,000 square foot office building, initiated by a land sale and resulting in a full design-build, turnkey project with the Opus Real Estate group.

Woodbury, Minnesota

^ Top

Distribution Office

Juhl-Pacific, USA — 1986

A 65,000 square foot, 2-story, build-to-suit office-warehouse; included sales, site search/selection process, contract negotiations and complete design-build services.

Eden Prairie, Minnesota

Eagandale Business Center, Phase 4 — 1986

A 75,000 square foot, 1-story, spec service center project built in the Eagandale Business Park for NML.

Eagan, Minnesota

Twin City Material Management Center — 1986–1987

An 85,000 square foot, 2-story speculative office-warehouse facility for NML in the Eagandale Business Park; distribution center for Sperry Corporation to house office, laboratory and warehousing space.

Eagan, Minnesota

Osmonics Additions — 1986

A 32,000 square foot high bay warehouse addition to existing corporate operations facility; provided full sales effort, contract negotiations and complete design-build services.

Minnetonka, Minnesota

LaMaur Addition — 1987

An 136,000 square foot warehouse addition and a 2-story, 25,000 square foot office addition with major interior remodeling; sales, contract negotiations and complete design-build services were provided.

Fridley, Minnesota

Lone Oak Business Center — 1988

A 85,000 square foot speculative, multi-tenant office-warehouse project, developed for the Opus account.

Eagan, Minnesota

^ Top

Elderly Care

St. Theresa Elderly Care Center — 1986–1987

A 230-unit, 9-story elderly retirement/care center for the St. Theresa Home; included underground parking, dining, and recreational provisions; complete design-build services were provided.

Hopkins, Minnesota

^ Top

Retail

Toros of Aspen Restaurant — 1980

A 7,500 square foot, 125-seat Mexican-American restaurant; a negotiated Design-Build Contract.

Opus 2 Office Park; Minnetonka, Minnesota

Harold Hyundai Dealership — 1987

A 25,000 square foot automobile dealership and used car building.

Bloomington, Minnesota

RWA Project Timeline

<- Gingold-Pink Architecture, Inc. Setter, Leach & Lindstrom, Inc. Paul Katz & Associates Opus Corporation Opus Southwest Corporation RWA Contract Services ->
Select an era from above

Building Type